Forest Department


  • Official Memorandum of Bangalore Metro Rail Corporation Limited (BMRCL), Bengaluru project of "RHS of BTM Layout Main Road, Ragigudda Metro Station, Bengaluru for Construction of Proposed Footpath, Ramps and Social Spaces”
  • Public Notice for Rail infrastructure Development Company (Karnataka) Limited (KRIDE), Bengaluru project of “Additional Project of Corridor-2 of Bengaluru Suburban Railway Project (BSRP) Design and Construction of Elevated Viaduct of Length 8.027 KMs and AT-Grade Section of Length 17.551 KMs from Benniganahalli to Chikkabanavara excluding station buildings of Corridor-2 of BSRP”
  • Public Notice for Airforce Station, Jalahalli, Bengaluru project of “Construction of New Infrastructure at Air Force Station”
  • Public Notice for BWSSB, Vrushabhavathi Vally Division, Mysore Road, Nayandahalli, Bengaluru project of “Upgradation of the Existing Sewage Treatment Plant from 01 Million liters capacity to 10 Million liters capacity”
  • Public Notice for Border Security Force (BSF), AFS-Yelahanka, Bengaluru project of “ Widening of the Road and for Safety of Infrastructure Buildings”
  • Invitation for registration as “Kere Mitra”/ “Hasiru Mitra” for lakes and parks respectively under Bhruhat Bengaluru Mahanagara Palike
  • Conditions of Kere Mitra
  • Official Memorandum of South Western Railway, Bengaluru project of “Remodelling of Channasandra Railway Station”
  • Public Notice for South Western Railway, Bengaluru project of “Construction of New Lines (Quadrupling)”
  • Official Memorandum of BBMP project of “ Elevated Corridor from Ejipura Main Road, Inner Ring Road to Kendriya Sadana”
  • Public Notice for Gandhi Krushi Vignana Kendra (GKVK), Bengaluru project of “Establishment of Progency Orchard and Front Line Demonstration of High Yielding Varieties and Hybrids of Cashew”
  • Public Notice for BWSSB, Kapilabhavana, Bengaluru project of “Work of Installation of Sanitary Pipeline”
  • Official Memorandum of Rail Land Development Authority, Bengaluru project of “Construction of 132 Nos Railway Quarters at MG Railway Colony Area”
  • Public Notice for Bangalore Metro Rail Corporation Limited (BMRCL), Bengaluru project of “Construction of Proposed Footpaths, Ramps and Social Spaces” in Reach-5 P3
  • Tree species list and soli analysis report for Compensatory Plantation plan for removal 16 number of plants by BMRCL in lieu of Hon'ble High Court of Karnataka order dtd.30-09-2022 for WP No.17841/2018
  • Tree species list and soli analysis report for Compensatory Plantation plan for removal of 245 number of plants by BMRCL in lieu of Hon'ble High Court of Karnataka order dtd.30-09-2022 for WP No.17841/2018
  • Public Notice for South Western Railway, Bengaluru project of “Remodelling of Channasandra Railway Station”
  • Public Notice for Rail infrastructure Development Company (Karnataka) Limited, KRIDE, Bengaluru project of “KRIDE Corridor-4 of Bengaluru Suburban Railway Project (BSRP) Extending Between Ambedkarnagar and Muddanahalli Cross”
  • Quarterly progress report regarding Translocation & Compensatory Plantation of trees by BMRCL, Bengaluru from April 2023 to June 2023
  • Compensatory Plantation plan for raising 245 number of plants by BMRCL in lieu of Hon'ble High Court of Karnataka order dtd.30-09-2022 for WP No.17841/2018
  • Compensatory Plantation plan for raising 2450 number of plants by BMRCL in lieu of Hon'ble High Court of Karnataka order dtd.30-09-2022 for WP No.17841/2018
  • Compensatory Plantation plan for raising 16 number of plants by BMRCL in lieu of Hon'ble High Court of Karnataka order dtd.30-09-2022 for WP No.17841/2018
  • Official Memorandum of Bangalore Metro Rail Corporation Limited (BMRCL),Bengaluru project of " Construction of Elevated Structures (Viaduct &Stations), including Road Widening, Utility Diversion and Allied works andConstruction of Loops, Ramps for Road Flyovers at CSB Junction includingRoad Widening & Allied Works in Reach 5 Line and Phase 3A Works”
  • Official Memorandum of Government First Garde College, Kengeri Project in the Campus for “Construction of New College Building and Play Ground”
  • Official Memorandum of Bangalore Metro Rail Corporation Limited (BMRCL), Bengaluru project of " Construction of Elevated Structures (Viaduct & Stations), including Road Widening, Utility Diversion and Allied works and Construction of Loops, Ramps for Road Flyovers at inside BMRCL acquired Defence Campus area, Ibblur Metro Station including Road Widening & Allied Works in Reach 5 Line and Phase 3A Works”
  • Public Notice for Chief Administrative officer, Air Force Station, Chimney Hills, Bengaluru project of “Provision of Quantity-06 Married Accommodation for SQN LDR & above against Deficient Accn at AF Stn Chimney Hills ”
  • Public Notice for Assistant Commissioner of Police, Sheshadripuram Sub division, Bengaluru project of “ Construction of 128 Nos PC Quarters ”
  • Public Notice for Rail Land Development Authority, Bengaluru project of “ Construction of 132 Nos Railway Quarters at MG Railway Colony Area”
  • Public Notice for Assistant Commissioner of Police, Sheshadripuram Sub division, Bengaluru project of “ Construction of 128 Nos PC Quarters ”
  • Public Notice for Karnataka State Fire and Emergency Services, Bengaluru project of “ Construction of New Workshop Building”
  • Planting Program from BBMP Forest Department South Zone for the year 2022-23
  • Planting Program from BBMP Forest Department West Zone for the year 2022-23 .
  • Planting Program from BBMP Forest Department Mahadevapura Zone for the year 2022-23 .
  • Public Notice for Bangalore Metro Rail Corporation Limited (BMRCL), Bengaluru project of “Construction of Elevated Rashtriya Military School Metro Station in Reach 6, under Ground Line” .
  • 'Quarterly progress report regarding Translocation & Compensatory Plantation of trees by BMRCL, Bengaluru from January 2023 to March 2023 .
  • Official Memorandum of BWSSB Project “Work Design, Upgradation and Rehabilitation of existing 248 MLD Capacity Used Water Treatment Plant” .
  • Public Notice for Bangalore Metro Rail Corporation Limited (BMRCL), Bengaluru project of " Construction of Elevated Structures (Viaduct & Stations), including Road Widening, Utility Diversion and Allied works and Construction of Loops, Ramps for Road Flyovers at inside BMRCL acquired Defence Campus area, Ibblur Metro Station including Road Widening & Allied Works in Reach 5 Line and Phase 3A Works”
  • Planting Program from BBMP Forest Department Dasarahalli Zone for the year 2022-23
  • Planting Program from BBMP Forest Department South Zone for the year 2022-23
  • Planting Program from BBMP Forest Department West Zone for the year 2022-23
  • Planting Program from BBMP Forest Department Bommanahalli Zone for the year 2022-23
  • Planting Program from BBMP Forest Department Rajarajeshwarinagar Zone for the year 2022-23
  • Public Notice for Bangalore Metro Rail Corporation Limited (BMRCL), Bengaluru project of " Construction of Elevated Structures (Viaduct & Stations), including Road Widening, Utility Diversion and Allied works and Construction of Loops, Ramps for Road Flyovers at CSB Junction including Road Widening & Allied Works in Reach 5 Line and Phase 3A Works”
  • Compensatory Afforestation Plan for raising 34310 numbers of plants by CRPF
  • Compensatory Afforestation Plan against the tree felling Proposal of South Western Railway Project of "Redevelopment and Construction of New Buildings at Bangalore Cantonment Railway Station, Bengaluru”
  • Public Notice for Construction of New College Building and Play Ground
  • Official Memorandum of K-RIDE Project "Railway Doubling Project extending from Yeshwanthpura Railway Station to Channasandra Railway Station"
  • Official Memorandum - Bengaluru Suburban Railway Project (BSRP), Corridor 02, Package 02 extending from Lottegollahalli Railway Station to Chikkabanawara Railway Station.
  • Official Memorandum of K-RIDE Project "Railway Doubling Project extending from Yeshwanthpura Railway Station to Channasandra Railway Station"
  • Official Memorandum of ARDC, HAL Project "Construction of Building for Facility Establishment for LCA MWF MK2 Hangars".
  • Official Memorandum of South Western Railway Project "Redevelopment and Construction of New Buildings at Bangalore Cantonment Railway Station".
  • Official Memorandum of K RIDE Project, "Bengaluru Suburban Railway Project (BSRP) Corridor-2, Package 1 between Baiyappanahalli Railway Station to Lottegollhalli Railway Station".
  • "Construction of Elevated Structures for the stretch extending from HSR Layout station and till dead-end (Chainage 5788.52m to 551.00m) including Road widening and allied works and 05 nos. of metro stations, viz., Central silk Board, BTM Layout, Jayadeva Hospital, Ragigudda and RV Road"
  • Quarterly progress report regarding Translocation & Compensatory Plantation of trees by BMRCL, Bengaluru from October 2022 to December 2022
  • Public Notice for National Institute of Virology Project of "Establishment of National Institute of Virology, South Zone"
  • Planting Program from BBMP Forest Department Dasarahalli Zone for the year 2022-23
  • Planting Program from BBMP Forest Department South Zone for the year 2022-23
  • Public Notice for CRPF project of " Removal of Matured Eucalyptus and Acacia trees"
  • Official Memorandum of "Widening of Storm Water Drain at Soundarya Park".
  • Public Notice for Work of Design, Upgradation and Rehabilitation of existing 248 MLD capacity Used Water Treatment Plant
  • Official Memorandum of Highway, Project Area extending from Gunjur to Bellathur Bridge for KRDCL Project Improvement and Widening of Road” Bengaluru ".
  • Official Memorandum of Project Area extending from Doorvaninagar to Kempapura Cross for BMRCL Project Dtd.18-01-2023
  • Official Memorandum of Re-Development of Yeshawanthpur Railway Station".
  • Official Memorandum of Bengaluru Suburban Railway project (BSRP) in Corridor-2, Bengaluru".
  • Planting Program from BBMP Forest Department West Zone for the year 2022-23
  • Planting Program from BBMP Forest Department East Zone for the year 2022-23
  • Tree Census data of Bangalore Urban Division Volume-XIII
  • Planting Program from BBMP Forest Department South Zone for the year 2022-23
  • Official Memorandum of Widening and Development of Road from Cauvery Theatre Junction to Mekhri Circle (From Palace Gate-9 to Palace Gate-4), Bengaluru".
  • Planting Program from BBMP Forest Department Yelahanaka Zone for the year 2022-23
  • Planting Program from BBMP Forest Department East Zone for the year 2022-23
  • Planting Program from BBMP Forest Department Bommanahalli Zone for the year 2022-23
  • Planting Program from BBMP Forest Department Yelahanka Zone for the year 2022-23
  • Widening and Improvement of Carmelaram Road and Construction of ROB
  • Construction of New Lines (Quadrupling) and ROB
  • Widening of Tumkur Main Road from Nelagadaranahalli Cross to Ganga International School
  • Planting Programme from BBMP Forest Department Mahadevapura Zone for the year 2022-23
  • Planting Programme from BBMP Forest Department Mahadevapura Zone for the year 2022-23
  • Compensatory Plantation plan for raising 2320 number of plants by BMRCL in lieu of Hon'ble High Court of Karnataka order dtd.30-09-2022 for WP No.17841/2018
  • 'The Compensatory Afforestation Plan against the tree felling proposal of the BMRCL Project of trees between Central Silk Board and Kodibeesanahalli Metro Station, Bengaluru Urban limits, Phase-2A, Package-I, Bengaluru
  • ''Public Notice for Re-development work at Yeshwanthpur Railway Station"
  • "Public Notice - Widening and Improvement of Road from Gunjur (BBMP limits Chainage 26.680) to Belathoor Bridge (Chainage 37,450)"
  • Public Notice for Main road improvement by widening
  • Public Notice for Main road improvement by widening
  • K-RIDE Project for BSRP, Corridor 2, Package 1, from Lottegollahalli to Chikkabanawar
  • Public Notice for SWR for Construction of New Buildings in Bangalore Cantonment Railway Station
  • Public Notice for Construction of Govt. College Building and College Ground
  • Official Memorandum dtd: 19.09.2022- Permission regarding removal of trees falling between Central Silk Board and Kodibeesanahalli Metro Station (129 Trees) Phase-2A, Package- 1 of Bengaluru Metro Rail Project.
  • Widening of Storm Water Drain at Ward No. 18, next to Radhakrishna Temple
  • Public Notice for Construction of building for Facility Establishment for LCA MWF MK2 Hangars at ARDC, HAL
  • 'Official Memorandum issued for CGAOT Project, OTM and other Allied Facilities'.
  • "Field Inspection Report with regard to the status of compensatory aforestation as well as the status of the tree saplings as well as the translocated trees".
  • "Quarterly Progress Report submitted by BMRCL regarding translocation of trees for the period January 2022 to March 2022".
  • "Quarterly Progress Report submitted by BMRCL regarding Compensatory Afforestation for the period January 2022 to March 2022".
  • "Quarterly Progress Report submitted by BMRCL regarding translocation of trees for the period April 2022 to June 2022".
  • Quarterly Progress Report for Compensatory Afforestation for the period April 2022 to June 2022
  • Construction of New Lines and Railway Over Bridge
  • 'The Compensatory Afforestation Plan against the tree felling proposal of the BMRCL Project of trees from Kempapura Metro Station to Bagalur Cross (BBMP Limits), Phase 2B, Package 2, Bengaluru
  • Official Memorandum dtd: 29.08.2022- Permission regarding translocation and felling of trees falling between Kempapura to Shettigere pertains to Phase- 2B Package- 2 & 3 of Bengaluru Metro Rail Project
  • "KRIDE Doubling Project, Karmelaram to Baiyappanahalli"
  • Official Memorandum dtd: 26.07.2022- Permission regarding translocation and felling of trees falling between Kempapura Metro Station to Baglur Cross pertains to Phase- 2B Package- 2 & 3 of Bengaluru Metro Rail Project.
  • "Construction/Remodelling of Primary & Tertiary drains at Sy. No. 72, 66 & 65 in Yelahanka Zone, BBMP".
  • Coast Guard Aeronautical Overseeing Team, HAL, Helicopter Division, Vimanapura Post, Bengaluru request for the removal of trees for the Project of 'OTM Accommodation and Allied Facilities'.
  • 'K-RIDE, Corridor-2 of Bengaluru Suburban Railway Project (BSRP), Package 1 between Baiyappanahalli to Lottegollahalli '
  • 2022-23 Tree Census Data of Bangaluru Urban Division
  • Official Memorandum dtd: 10.06.2022- Permission regarding felling of trees falling between Central Silk Board and Kadubeesanahalli (15 Trees) Phase-2A, Package- 1 of Bengaluru Metro Rail Project.
  • Official Memorandum dtd: 10.06.2022- Permission regarding felling of trees falling at Vellara Junction Metro Station- 07 Trees (Rashtriya Military School) for Underground Metro Works of Phase-2, Reach- 6 of Bengaluru Metro Rail Project
  • Widening and railway over bridge Improvements of Karmeleram Road (Sarjapura Road junction to Nirjhari Study Centre)
  • Compensatory Plantation plan pertains to Kothnur Depot (Reach- 6 Elevated) ) Phase- 2 of Bangalore Metro Rail Project
  • Compensatory Plantation plan pertains to U M Kaval village, Uttarahalli hobli of Bangalore Metro Rail Project"
  • "Compensatory Plantation plan pertains to Vijinapura village Sy no. 79 and Benniganahalli village no. 80 & 83 (Reach- 1A) Phase- 2 of Bangalore Metro Rail Project"
  • OM of Improvements, Development and Widening of Road over a stretch of 2.19 KMs on Bellary Road on NH 7 extending from Royal International School via NITTE Meenakshi College Road to Gantiganahalli, upto BBMP Limits. "
  • "Details of Public Notice for BMRCL's proposal for removal of trees in Central Silk Board to Kodibeesanahalli Metro Station area pertaining to Outer Ring Road (ORR) line Phase- 2A Package- 1 (Additional 127 Trees) of Bangalore Metro Rail Project. "
  • "Compensatory Plantation plan pertains to CSB to Kodibeesenhalli (256 Trees) pf Phase- 2A BMRCL Project
  • "Road Widening of Tumkur Main road from Nelagadaranahalli Cross to Ganga International School"
  • "Public Notice of Construction of Underground Metro Works at Vellara Junction Metro Station (Rashtriya Military School), Phase- 2, Reach- 6".
  • Details of Public Notice Laying of white topping from CNR Rao underpass to Mekhri Circle Road on Tumkuru road. Project by EE, Road Infrastructure, White topping section, BBMP
  • Official Memorandum 10.03.2022- Permission regarding translocation and felling of trees falling between Kasturinagar to Kempapura pertains to Phase- 2B Package- 1 of Bengaluru Metro Rail Project"
  • Official Memorandum dtd: 07.03.2022- Permission regarding felling of trees falling at Vellara Junction Metro Station (Rashtriya Military School) for Underground Metro Works of Phase-2, Reach- 6 of Bengaluru Metro Rail Project
  • Tree Census Data of Bangalore Urban Division
  • OM Improvement to drains, footpaths and asphalting of roads in malleshwaram constituncey R1 west Zone Pakage No- WZ-2019-20 on a stretch extending from cricle Maramma temple to CET cell
  • Improvements, Development and Widening of Road over a stretch of 2.19 KMs on Bellary Road NH 7, extending from Royal International School via NITTE Meenakshi College Road to Gantigana halli (Railway Line), till BBMP Limits near Vidyashilpi Academy
  • "Official Memorandum dated 21.01.2022- Permission regarding translocation and removal of trees which are standing in the proposed area for Widening of Sarjapur Main Road, from Outer Rind Road near Iblur Junction upto BBMP Limits, near Chikka Kannahalli Road, ROB, Bengalurut".
  • “Public Notice dtd 29.12.2021 - Removal of trees standing at Vellara Junction Metro Station (Rashtriya Military School) for Underground Metro Works of Phase-2, Reach 6.
  • “Public Notice dtd 29.12.2021 - Removal of trees standing between Baiyappanahalli to Chikkabanawar in Corridor-2 for Bengaluru Suburban Railway Project (BSRP), of Rail Infrastructure Development Company (Karnataka) Limited, K RIDE
  • Permissions for Tree felling given by BBMP Forest Wing during 2021-2022 (From August-2021 to September -2021)
  • Permissions for Tree felling given by BBMP Forest Wing during 2021-2022 (From October-2021 to November -2021)
  • Official Memorandum 10.12.2021 – Permission regarding translocation and removal of trees which fall in the proposed area of Construction of Grade Separator to Kengeri Outer Ring Road across Annapoorneshwari Main Road, Bengaluru”
  • Official Memorandum 10.12.2021- Permission regarding translocation and felling of trees falling between Kodibeesanahalli Metro Station to K R Puram (UptoBaiyappanahalli Depot) area pertaining to Outer Ring Road (ORR) line Phase- 2A Package- 2 of Bengaluru Metro Rail Project
  • Official Memorandum 09.12.2021- Permission regarding translocation and felling of trees falling between Central Silk Boardto K R Puram (UptoBaiyappanahalli Depot) area pertaining to Outer Ring Road (ORR) line Phase- 2A of Bengaluru Metro Rail Project
  • Official Memorandum 26.11.2021- Permission regarding translocation and felling of trees falling between Central Silk Board to Kodibeesanahalli Metro Station up to pier No.- 335 area pertaining to Outer Ring Road (ORR) line Phase- 2A Package- 1 of Bengalore Metro Rail Project"
  • Removal of trees at dooravani nagar and Kempapura cross for the Metro construction activities Phase-2B package-1
  • Construction work of Grade Separator to Kengeri outer ring road across Ullal Main Road Bengaluru
  • Removal and transplantation of trees obstructing the Construction of Approach Road to Railway Over Bridge (Lc No-4A)
  • Official Memorandum for Translocation and Removal of trees which fall in the proposed area of Elevated Corridor form Ejipura Main Road Inner Ring Road to Kendriya Sadana
  • Details of Public Notice for BMRCL's proposal for removal of trees in Kodibeesanahalli Metro Station to Baiyappanahalli Depot area pertaining to Outer Ring Road (ORR) line Phase- 2A Package- 2 of Bangalore Metro Rail Project, Inviting objections under section 8(3)(vii) of KPT Act 1976 within 10 days from this display date"
  • Details of Public Notice regarding trees infringing metro works for Package 2&3(Urban) Phase-2B
  • Details of Public Notice for BMRCL's proposal for removal of trees in Central Silk Board to K R Puram upto Baiyappanahalli Depot area pertaining to Outer Ring Road (ORR) line Phase- 2A of Bangalore Metro Rail Project, Inviting objections under section 8(3)(vii) of KPT Act 1976 within 10 days from this display date.
  • Details of Public Notice Trees Infringing the Metro Construction works from Kempapura to Bagalur cross Package 2&3 of Airport line Phase -2B.
  • Addendum regarding Public Notice regarding Tree Felling from Kasthuri Nagar to Kempapura Phase 2B ,Package 1.
  • Compensatory Afforestation in lieu of felling of trees standing in work areas of south Ramp (Jayanagar Fire Station) to Nagawara (North Ramp).
  • Details of Public Notice Trees Infringing the Metro Construction works from Kasthuri Nagr to Kempapura of ORR Line Package-1 Phase -2B.
  • Tree Census data of Bangalore Urban Division Volume-VIII
  • Tree Census data of Bangalore Urban Division Volume-VII
  • Details of Public Notice for BMRCL's proposal for removalof trees in Central Silk Board to Kodibeesanahalli Metro Station up to pier No.-335 area pertaining to Outer Ring Road (ORR) line phase-2A Package-1 of Bengalore Metro Rail Project, Inviting objections under section 8(3)(vii) of KPT Act 1976 within 10 days from this display date
  • Permission for Tree felling given by BBMP Forest Wing from April 2021 to June 2021
  • Receptor Location Details of Kothnur Depot. Entry Line ,Phase-2,R6 Elevated
  • Receptor Location Details of Langford Metro Station R6 UG
  • Receptor Locations Details aganist OM South Ramp to North Ramp(Nagawara) R6 UG
  • Tree Census data of Bangalore Urban Division Volume-VII
  • Corrigendum for official Memorandum regarding Kothnur Depot Entry Line Dtd.08.04.2021
  • Corrigendum for OM Dt.18.05.2021of Langford UG Metro Project
  • Compensatory Plantation Plan regarding tree felling at kothnur Depot.(Reach-6) Phase-2 of BMRCL
  • Compensatory plantation plan for by BMRCL in LIEU of removal of trees from langford metro station bangalore metro rail corporatation (BMRCL) phase –II, Project location.
  • Official Memorandum 18-05-2021- Permission regarding regarding removal of trees in connection with construction work of Langford UG Metro station area pertaining to Reach-6 Corridor Bengaluru between south Ramp(Jayanagar Fire Station) to North Ramp(Nagawara) on Reach 6 UG, BMRCL
  • Documents pertaining to Official Memorandum issued regarding removal of 604 exempted tree in Metro Rail Construction work Phase-2, R-6 elevated (Kotnur Depot) at Sy No 87/3, 87/7 and 87/2 of Kotnuru Village.
  • Documents pertaining to Compensatory Plantation against the tree felling proposal of BMRCL Project of Phase-2, R-6 elevated (Kothnur Depot Entry line)
  • Details of Public Notice for BMRCL's proposal for removal of trees in Kodibeesanahalli Metro Station to Baiyappanahalli Depot area pertaining to Outer Ring Road (ORR) line Phase- 2A Package- 2 of Bangalore Metro Rail Project, Inviting objections under section 8(3)(vii) of KPT Act 1976 within 10 days from this display date
  • Compensatory plantation plan details regarding felling of tree for Kadugodi Plantation Sy.NO 1
  • Compensatory plantation plan details regarding felling of trees for Benniganahalli Tank Bund(R1-A)
  • Compensatory afforestation plan details regarding felling of tree from RV road to HSR Layout Via Marenahalli road (R5-P3)"
  • Compensatory Afforestation in lieu of felling of trees standing in work areas of south Ramp (Jayanagar Fire Station) to Nagawara (North Ramp)
  • Official Memorandum 09-04-2021- Permission regarding translocation and felling of trees falling at Kothnur depot entry line Reach 6(Elevated),Phase 2.
  • Compensatory plantation plan details regarding felling of tree for Kadugodi Plantation Sy.NO 1.BMRCL.
  • Compensatory plantation plan details regarding felling of trees for Benniganahalli Tank Bund(R1-A).BMRCL
  • Official Memorandum 26-03-2021- Permission regarding translocation and felling of trees falling at Kadugodi plantation
  • Planting list South Zone BTM Layout and Jayanagara Constituency during 2020-21. (Hon”ble Mayor Fund)
  • Tree Cutting Details
  • Planting list South Zone Vijayangara and Chickpete Constituency during 2020-21.(Hon”ble Mayor Fund)
  • Official Memorandum 23-03-2021- Permission regarding translocation and felling of trees falling between South Ramp(Jayanagar Fire Station) to North Ramp(Nagawara) on Reach 6 UG, BMRCL
  • Documents pertaining to the public notice issued with regard to Construction of Grade Separator to Kengeri Outer Ring Road across Annapurnashwarinagara Main Road are enclosed here with a request to uploaded to the same in the website of BBMP.
  • Documents pertaining to the public notice issued with regard to Construction of Grade Separator to Kengeri Outer Ring Road across Ullal Main Road are enclosed here with a request to uploaded to the same in the website of BBMP.
  • Documents pertaining to the Official Memorandum against the tree felling proposal of BMRCL project Byappanahlli to Visweswaraiah Industrial Area Station at Benniganahalli lake bund area (Reach-1A) of Bangalore Metro
  • Documents pertaining to the Official Memorandum issued regarding removal of trees in connection with R V Road and HSR Layout via Marenahalli Road in Reach-5 Package -3 of Bangalore Metro Project are enclosed here-with a request to upload to the same in the website of BBMP.
  • TREE CENSUS OF BANGALORE URBAN VOLUME -6
  • TREE CENSUS VOLUME - 4
  • MAHADEVAPURA KRIDL
  • TREE CENSUS- ABSTRACT
  • Uploading The Official Public Notice Of Tree Felling Proposal Of BMRCL Project
  • Infringing for road Wideining works, Area Development for Bus Hub, parking, multi integration etc, and Jyothipuram Metro Station EntryExit Structures
  • Official Memorandum issued with regarding the removal of tree in connection with Construction of subway road from NES Circle to Yelahanka Railway Station for Railway crossing BBMP-reg
  • Tree census vol-5
  • Official Memorandum 16-01-2021
  • NCS- Planting 2020-21
  • Planting- 2020-21
  • Estimate-Planting KRIDL
  • Planting- 2019-20
  • Planting- 2020-21
  • Annexure-1
  • Annexure-2
  • Annexure-3
  • Official Memorandum
  • National Memorial
  • Belatturu Bridge to Kannamangala cross from Chinage 37+500 to 40+171 KM this may please be treated as urgent (WP 17841)
  • Tree Census Of Banglore Urban Division Volume-4
  • Tree Census Of Banglore Urban Division Volume-3
  • Tree Census Volume-3
  • Tree Census Volume-3
  • Details Of Tree Census As On 05/12/2020
  • Regarding cutting down of trees which are disturbing the construction of Metro at Kadugodi Wildlife Survey no.1
  • Public Notice
  • Details of Public Notice for BMRCL 's proposal for removal of trees at South Ramp(Jayanagar Fire station ) to North Ramp (Nagawara) Reach 6 (UG). Inviting objections under section 8(3)(vii) of KPT Act 1976 within 10 days from this display date".
  • A public notice issued for removal of trees/saving/retention of trees, which are infringing to the metro projects
  • WARD WISE/ LOCATION WISE DETAILS OF PLANTS PLANTED
  • CONTRACTOR DETAILS OF TREE CANOPY MANAGEMENT
  • DEPUTY CONSERVATOR OF FORESTS
  • WARD WISE DETAILS OF PLANTATIONS
  • TREE CENSUS REPORT -1
  • TREE CENSUS REPORT -2
  • TREE CENSUS OF BANGALORE URBAN VOLUME -1
  • TREE CENSUS OF BANGALORE URBAN VOLUME -2
  • TREE CENSUS OF BANGALORE URBAN VOLUME -3
  • TREE CENSUS OF BANGALORE URBAN VOLUME -4
  • OM dated 21.5.2020
  • OM annex.1
  • OM annex.2
  • Letters
  • TEC proceedings 16.3.2020
  • TEC proceedings 28.4.2020
  • OM dated 17-10-2020
  • OM Annex - 1 to OM dt: 17-10-2020
  • OM Annex - 2 to OM dt: 17-10-2020
  • OM Annex 3 & 4 to OM dt: 17-10-2020
  • Official Memorandum of Tree Officer, 23.10.20 for Kothnur Entry Depot Entry Line
  • Proceedings of TEC dtd.14.10.2020 and Supporting Documents for Kothnur Depot Entry Line-( Annexure 1, to OM (1687) dtd 23.10.2020)
  • Official Memorandum ofTree Officer ,23.10.20 for U M Kaval Depot
  • Proceedings of TEC dtd.14.10.2020 and Supporting Documents for U M Kaval Depot-( Annexure 1, to OM (1686) dtd 23.10.2020)
  • Official Memorandum Tree officer , dtd 23.10.20 for Bennaganahalli Tank Bund
  • Proceedings of TEC dtd.14.10.2020 and Supporting Documents for Benaganahalli Tank Bund-( Annexure 1, to OM (1685) dtd 23.10.2020)
  • Official Memorandum (26/8/2021)Permission regarding removal of trees in Connection with Construction work of Kothnur Depot (Reach-6) Phase -2
  • Official Memorandum (Dated ;26/08/2021) Permission Regarding removal of trees in Connection with Construction work at Vijinapura SY no 79 & Benniganahalli village SY no 80&83 & Jyothipuram Metro Station Entry and Exit Structure Reach - 1A
  • Documents pertaining to the Official Memorandum against the tree felling proposal of BMRCL project U M Kawal (Anjanapura Depot Reach-4B)